Projects

Installed, energized, supported

Equipment supplied, designed and commissioned by EVKON — installed by our contractor partners.

48
States served
1000+
Ports installed
10 MW
Largest single site
$5M+
Total captured incentives

Featured case study

Seven rebate-qualified sites from one garage

A nine-story garage at Connecticut Children's Medical Center was drawn with 28 chargers on three floors — compliant, and worth one project site to the utility. EVKON proposed the same 28 chargers across seven floors, and Eversource approved each as an independent site.

Approximately $280,000 in EV infrastructure cost savings, with the charger count unchanged. The electrical contractor kept their scope and their customer.

Read the case study

≈$280,000 saved

In EV infrastructure cost, found in the drawings.

28 stations, unchanged

Delivered exactly as originally intended.

Eversource approved

Seven floors recognized as seven Make-Ready sites.

Auto dealership EV charging installation

Auto Dealership

Customer Rodman Ford
Location Massachusetts
Equipment 3 × Autel 180 kW MaxiCharger, 3 × dual-port Autel AC Ultra 19.2 kW
Capacity 800 kW
Utility National Grid
EVKON scope Equipment / design / incentive / commissioning
Parking garage EV charging installation

Parking Garage

Customer LAZ Parking
Location Hoboken, NJ
Equipment 10 × dual-port 19.2 kW (20 ports)
Capacity 460 kW managed
Utility PSE&G
EVKON scope Equipment / design / incentive / load management / commissioning / networking
Hotel and resort EV charging installation

Hotel / Resort

Customer Ocean Edge Resort & Golf Club
Location Brewster, MA
Equipment 1 × 180 kW DC Fast & 8 × dual-port 19.2 kW
Sites Energized 3 sites
Utility Eversource
EVKON scope Equipment / design / project management / incentive / commissioning / future support