DC fast charging

50 kW to megawatt. Designed, supplied, commissioned.

DC fast charging is where projects stall — service capacity, utility timelines, power sharing, network selection and commissioning all have to line up.

EVKON carries Alpitronic and Autel Energy DCFC and works the whole sequence with your team, from first site walk to energization and driver-ready operation.

DC fast charging installation

Sizing by application

50–100 kW

Fleet depot, dealership

Overnight dwell and service-bay charging where vehicles sit for hours. Lowest service impact.

150–200 kW

Retail, corridor

Single-cabinet units for 20–30 minute public sessions. The most common commercial size.

300–400 kW

High-throughput plaza

Multi-dispenser systems with dynamic power sharing across four vehicles.

MW / heavy duty

Class 8, transit

Staged build-outs with utility make-ready, switchgear coordination and phased energization.

The sequence we run with you

Every step below is included with the equipment package — not billed as consulting.

Site assessmentINCL
Utility coordinationINCL
Electrical requirements & service sizingINCL
Charger sizing and power sharingINCL
Network selectionINCL
Incentive captureINCL
Equipment procurementINCL
Commissioning & trainingINCL
Warranty and serviceINCL
01

Site assessment

Existing service, transformer capacity, conduit routes, ADA and dispenser placement.

02

Utility coordination

Load letter, make-ready application and realistic energization timeline.

03

Power architecture

Cabinet-to-dispenser layout, power sharing and future expansion headroom.

04

Network selection

Pricing, access control, roaming and uptime reporting matched to the operator.

05

Commissioning

Startup, protocol testing, first-session validation and crew training.

06

Ongoing support

Warranty administration, parts, remote diagnostics and escalation path.